Client Central Christian Church
Location Gilbert, Arizona
Scope 160-acre master planned, phased church campus

Central Christian Church

Project Details

Westwood’s Role

  • Surveying
  • Master Site Planning and Design
  • Stormwater Management
  • Street and Utility Construction
  • Drainage and Paving Planning
  • Construction Staking
  • Construction Administration

Overview

As a multi-phased development, this mega church campus includes worship facilities, a school, multiple parking lots, a circular drive, and sport courts and fields. Because of the size and complexity of the site, the team needed to design street and other infrastructure improvements through all phases of development and coordinate with multiple governing jurisdictions.

Planning for growth

Starting with 40 acres in phase I, major arterial street improvements were completed, included paving, water, sewer, storm drain, street line design, and the addition of a traffic signal. The team conducted master drainage, water, and sewer reports, and expanded the utility main line.

With additional phases, more parking space was created, as well as an additional street entrance to improve traffic flow. Supplemental master planning and design was needed to accommodate the proposed residential subdivision improvements.