Client Janus International
Location Surprise, Arizona
Scope Industrial trucking facility expansion to 74,000 SF

Janus Trucking Facility

Project Details

Westwood’s Role

  • Surveying
  • Land Planning and Design
  • Stormwater Management
  • Construction Staking
  • Construction Administration

Overview

This project was a phased industrial warehouse and trucking facility in a remote development area of Surprise. Phase I included 42,000 SF of office and warehouse improvements, and phase II added an additional 32,000 SF of warehouse space, as well as a semi-tuck access drive. Phase II accommodated the client’s future growth potential and enhanced the site to meet the facility’s operational demands.

Developing the Needed Infrastructure

At the time of construction for Phase I, the site did not have the necessary roadway or utility infrastructures in place to support the project. Therefore, major design and construction improvements to the adjacent arterial street were needed, including water and sewer main line installations. Since the water infrastructure had limited pressure, a fire tower had to be designed and constructed in conjunction with the fire protection measures for the building.