Pennsylvania Reliability Project

0045645_1.jpg
0045645_2.jpg
0045645_3.jpg
0045645_4.jpg
Location
Lancaster, Pennsylvania
Client
Investor Owned Utility
Scope

15 miles of 69 kV transmission line connecting three substations. Designed as single-circuit initial, future double-circuit using a combination of direct-embed Light-duty steel poles and engineered steel poles on concrete caisson foundations.

Roles
  • Transmission Line Design
  • Foundation Design
  • Construction Sequencing
  • Custom Steel Pole Design
  • Engineering and Bill of Material
  • Soil Borings
  • Geotechnical Investigation
  • Construction Support
  • PLS-CADD Modeling