115 kV Railroad Project

Location
Orange, Connecticut
Client
Investor-Owned Utility
Scope

Relocate 8.4 miles of double-circuit 115 kV transmission line from railroad lattice structures to over 100 independent steel poles on foundations

Roles
  • Site Design
  • Geotechnical Exploration
  • Construction Support
  • Line Inspection
  • Transmission Engineering and Deliverables
  • Underground line Design
  • Construction Sequencing