Advanced Metering Infrastructure Data Collection

R0025048.00_1.jpg
R0025048.00_2.jpg
R0025048.00_3.jpg
R0025048.00_4.jpg
Location
Pennsylvania
Scope

Engineering design for over 200 AMI collector poles at various substations as well as running fiber optic cable for various routers on the system. Goal for AMI was to reduce outages by transmitting data wirelessly to service centers. Each project required a 75’ LDE steel pole to be set and a 120 v service from the nearest distribution source, as well as fiber planning.

Roles
  • Highway Permits
  • Project Coordinator
  • Construction Notes
  • Project Closeout
  • Construction Drawings
  • Overhead Distribution
  • Engineering Survey
  • Engineering Design
  • ROW Notifications
  • Fiber Optic Communications