Alamo Solar Projects 2-7
Location
San Antonio, Texas
Client
Blattner Energy; M.A. Mortenson Construction; and OCI Solar Power
Scope
361 MWac (Phases 2-7) of 400 MWac solar project
Roles
- Construction Staking
- Substation Coordination
- Construction Support
- Aerial Photography
- Spill Prevention, Control, and Countermeasure Plans
- Permitting Support
- Civil Engineering
- Stormwater Pollution Prevention Planning
- Hydrology Study
- Electrical Engineering
- Monitoring, Plant Controller, Tracker and Security System Coordination
- Environmental
- Record Drawings
- Surveying