Alamo Solar Projects 2-7
Location
San Antonio, Texas
Client
Blattner Energy; M.A. Mortenson Construction; and OCI Solar Power
Scope
361 MWac (Phases 2-7) of 400 MWac solar project
Roles
- Surveying
- Aerial Photography
- Stormwater Pollution Prevention Planning
- Electrical Engineering
- Construction Support
- Record Drawings
- Environmental
- Substation Coordination
- Hydrology Study
- Spill Prevention, Control, and Countermeasure Plans
- Construction Staking
- Civil Engineering
- Permitting Support
- Monitoring, Plant Controller, Tracker and Security System Coordination