Alamo Solar Projects 2-7

0045628_1.jpg
0045628_2.jpg
0045628_3.jpg
Location
San Antonio, Texas
Client
Blattner Energy; M.A. Mortenson Construction; and OCI Solar Power
Scope

361 MWac (Phases 2-7) of 400 MWac solar project

Roles
  • Construction Staking
  • Substation Coordination
  • Construction Support
  • Aerial Photography
  • Spill Prevention, Control, and Countermeasure Plans
  • Permitting Support
  • Civil Engineering
  • Stormwater Pollution Prevention Planning
  • Hydrology Study
  • Electrical Engineering
  • Monitoring, Plant Controller, Tracker and Security System Coordination
  • Environmental
  • Record Drawings
  • Surveying