Amazon Air Regional Hub - Offsite Infrastructure

Location
Fort Worth, Texas
Client
Hillwood Development Company
Scope

Site planning and preliminary engineering for 570K SF Regional Hub at AFW Airport, including hangar, service buildings, entry drives, parking, apron, taxi-lane, and FAA transitional surfaces studies. Off-site infrastructure included thousands of linear feet of regional water and sanitary sewer lines, 2 detention ponds, and a 3,000 LF drainage channel. LOMR removed floodplain from developed and developable areas of the airport to accurately reflect current conditions.

Roles
  • Preliminary Engineering
  • Site Planning
  • Drainage Channel and Detention Ponds
  • LOMR Approved by FEMA
  • Offsite Public Improvements for Future Growth
Join our talented team.
Partner with us on your next project.
Westwood Footer Image Westwood Footer Image