CTH KW over Pratt Creek & S Bridge over Shaw Brook

0045846_1.jpg
Location
Dodge County, Wisconsin
Client
Dodge County Highway Department
Scope

This project involved structure design using a new and innovative construction technology, Geosynthetic Reinforced Soil – Integrated Bridge System (GRS-IBS), to replace two deteriorating bridges.

Roles
  • Investigation of Structures for GRS-IBS Construction
  • Environmental Documents
  • Agency/Utility Coordination
  • Survey
  • PS&E
  • Hydraulic Analysis
  • Preliminary & Final Structure Plans