Edwards-Sanborn Solar + Storage
Location
Kern County, California
Client
Terra-Gen & Mortenson
Scope
Currently, the largest single solar and battery energy storage project in the US. The project has 1.9 million solar modules, generating an impressive 875 MWDC of solar energy. Additionally, it boasts 3,287 MWh of energy storage capacity, with a total interconnection capacity of 1,300 MW.
Roles
- Electrical Engineering
- Structural Engineering
- Civil Engineering
- Geotechnical Engineering
- Water Resources