Eisenhauer Northwood Devonshire Phase 1A

Location
San Antonio, Texas
Client
City of San Antonio
Scope

The City of San Antonio hired Westwood to provide roadway, drainage, and utility improvements for a City Bond project within the Devonshire neighborhood. The project consisted of approximately one mile of roadway reconstruction including a 10' x 7' box culvert, improved low water crossing, adjacent grass lined channel diverting flows, and replacing water, sanitary sewer and gas lines along the corridor.

Roles
  • Diversion Structure Design
  • Hydrologic/Hydraulic Modeling (1D/2D CPSWMM)
  • 3D Scanning of Existing Drainage Infrastructure for Design Accuracy and OSHA Compliance
  • Drainage Design and Floodplain Reduction
  • Box Culvert and Channel Design
  • Watershed Evaluation
  • Roadway Reconstruction
Join our talented team.
Partner with us on your next project.
Westwood Footer Image Westwood Footer Image