Empire and Blue Lake Community Solar Projects
Location
Farmington and Shakopee, Minnesota
Client
Cypress Creek Renewables; Oak Leaf Energy Partners; Metropolitan Council
Scope
Two community solar garden projects at 5 MWac and 3 MWac, fixed-tilt ground-mounted arrays
Roles
- Commission Assistance
- Construction Support
- Record Drawings
- Federal, State, and Local Permitting
- AC/DC Electrical Engineering
- Interconnection Coordination
- Landscape Plans
- Desktop Wetland Delineation
- Topographic Survey
- Environmental Site Assessments
- Stormwater Pollution Prevention Plan
- Civil Engineering
- Constraint Analysis
- Hydrology Study
- ALTA Survey
- Construction Staking