Empire and Blue Lake Community Solar Projects

Image
Image
Image
Location
Farmington and Shakopee, Minnesota
Client
Cypress Creek Renewables; Oak Leaf Energy Partners; Metropolitan Council
Scope

Two community solar garden projects at 5 MWac and 3 MWac, fixed-tilt ground-mounted arrays

Roles
  • Environmental Site Assessments
  • Federal, State, and Local Permitting
  • Hydrology Study
  • Landscape Plans
  • Desktop Wetland Delineation
  • Constraint Analysis
  • AC/DC Electrical Engineering
  • Interconnection Coordination
  • Civil Engineering
  • Stormwater Pollution Prevention Plan
  • ALTA Survey
  • Topographic Survey
  • Construction Staking
  • Construction Support
  • Commission Assistance
  • Record Drawings