Great Western Wind Project
Location
Woodward and Ellis Counties, Oklahoma
Client
EDF Renewables and Blattner Energy
Scope
Operational in 2016 with 225 MW and 93 turbines.
Roles
- Wetland Permitting
- LiDAR
- Utility Crossing Matrix
- Surveying
- Aerial Mapping
- Construction Staking
- ALTA Survey
- Turbine Micrositing
- Civil Engineering Design