Great Western Wind Project

Location
Woodward and Ellis Counties, Oklahoma
Client
EDF Renewables and Blattner Energy
Scope

Operational in 2016 with 225 MW and 93 turbines.

Roles
  • Wetland Permitting
  • LiDAR
  • Utility Crossing Matrix
  • Surveying
  • Aerial Mapping
  • Construction Staking
  • ALTA Survey
  • Turbine Micrositing
  • Civil Engineering Design
Join our talented team.
Partner with us on your next project.
Westwood Footer Image Westwood Footer Image