Horse Heaven Energy Center

Location
Benton County, Washington
Client
Scout Clean Energy
Scope

1,150 MW Wind, Solar, and Battery Storage (BESS)

Roles
  • Geotechnical Engineering
  • Aerial Mapping
  • Hydrology Studies
  • Preconstruction ALTA Survey
  • Landowner Plans
  • Civil Design and Engineering
  • Electrical Collection Design and Engineering
  • Electrical Studies
Join our talented team.
Partner with us on your next project.
Westwood Footer Image Westwood Footer Image