Iron Horse Energy Storage and Solar (BESS)
Location
Tucson, Arizona
Client
Signal Energy and E.ON
Scope
2 MWac PV array; 10 MW/2.5MWh energy storage
Roles
- Spill Prevention, Control, and Countermeasure Plans
- Structural Engineering/Foundation Design
- Water Resources
- Survey Staking
- Civil Engineering
- Issued for Construction Plans
- Record Drawings
- Performance Verification
- Construction Support
- Electrical Engineering
- Stormwater Pollution Prevention Plan
- Issue for Review Plans