Lindahl Wind Farm

Location
Williams County, North Dakota
Client
Tradewind Energy, Inc. and Enel Green Power
Scope

Operational in 2016 with 150 MW and 75 turbines.

Roles
  • Hydrology Study
  • ALTA Survey
  • Civil Engineering Design
  • Construction Staking
  • Permitting Support
  • Utility Discovery
  • Aerial Mapping
  • Stormwater Pollution Prevention Plan
Join our talented team.
Partner with us on your next project.
Westwood Footer Image Westwood Footer Image