Mount Signal 3 Solar

Location
Calexico, California
Client
Mortenson Construction
Scope

Operational in 2018 with 328.9 MWdc on single-axis tracking.

Roles
  • Spill Prevention, Control, and Countermeasure Plans
  • AC Electrical Engineering Design
  • SCADA and Communications
  • Grounding Study
  • Geotechnical Services and Investigation
  • Overhead Collector Design
  • Interconnection Coordination
  • Hydrology Studies and Modeling
  • Permitting Support
  • PV Plant Design
  • Stormwater Pollution Prevention Plans
  • Structural Engineering
  • Construction Survey
  • Pre-Design Pile Load Testing