Ownsby Parkway (Preston Road to future Coit Road)
Location
Celina, Texas
Client
City of Celina
Scope
Engineering design of approximately 2 miles of divided thoroughfare, with 4-lane and 6-lane sections, intersections, roundabout, and utilities on a fast-track schedule.
Roles
- Reconstruction/New Construction
- Construction Administration
- Arterial Thoroughfare with Intersections
- Design Survey
- Roundabout
- Fast-Track Design Schedule
- Re-Routing and Road Closure Construction Phasing Plan
- ROW Research/Platting
- Storm Drainage, Sewer, Water Design