Pennsylvania Transmission Relocation
Location
Northampton, Pennsylvania
Client
Investor-Owned Utility
Scope
Relocation 20 transmission circuits of 230 kV, 138 kV, and 69 kV totaling 4.3 miles. Included over 40 engineering steel poles on foundations.
Roles
- Transmission Line Engineering
- Construction Sequencing
- Geotechnical Investigations