STH 116, Main Street, Wolf River Bridge

Location
Winneconne, Wisconsin
Client
Wisconsin Department of Transportation
Scope

Provided design services to WisDOT for two separate projects that included over 1.3 miles of urban reconstruction in the Village of Winneconne, including replacement of the Wolf River Bridge, a bascule bridge, with a fixed bridge south of the existing structure.

Roles
  • Survey
  • Public Involvement Reports
  • Construction Staging
  • Engineering Design and Construction Administration
  • PS&E
  • Traffic Control
  • Traffic Analysis
  • Agency/Utility Coordination
  • Right-of-Way Plat
  • Pavement Marking
Join our talented team.
Partner with us on your next project.
Westwood Footer Image Westwood Footer Image