TRWD/DWU IPL Section 14

0045824_1.jpg
0045824_2.jpg
Location
Navarro County, Texas
Client
Tarrant Regional Water District
Scope

Sub-consultant for the design of Section 16 of the Integrated Pipeline project.

Roles
  • Corridor Study
  • Parcel by Parcel Route Evaluation
  • Pipeline Design
  • Topographic Survey