Western Spirit Wind
Location
Guadalupe, Lincoln, and Torrance Counties, New Mexico
Client
Blattner Energy
Scope
At 1051 MW, it is the most wind power ever constructed as a single phase in the US.
Roles
- SWPPP & SPCC
- Civil Design and Engineering
- Hydrology Studies