Scope

50 MW, 32 turbines, 8-mile 115 kV electric transmission line

Roles
  • Transmission Line Permitting
  • Turbine Micrositing and Staking
  • Permit Fulfillment
  • Construction Staking
  • Natural Resource Assessments and Field Studies
  • Stormwater Pollution Prevention Plan
  • ALTA/NSPS Land Title Survey & Aerial Mapping
  • Civil Engineering Design
  • Post-Construction Site Monitoring